client: Lafarge Cement UK
contract: JCT 1998 standard
value: £2.0 million
As interior designers for this high technology
project, we were involved in designing
spaces for the preparation, cleaning and
physical testing of concrete samples.
Analysis of the laboratory's work led to a
design which placed the heavy processes
on the ground floor whilst locating the
chemistry and particulates laboratories at
first floor level. The building has a total floor
area of 820m² supported by outbuildings,
plant areas and external facilities.
> Download PDF