Legacy – Stevenage New Town

Leonard Vincent and Ray Gorbing

In 1946, Stevenage was designated as a New Town, and the Development Corporation at the time was led by architects and planners Leonard Vincent and Ray Gorbing. Responsible for the first pedestrianised town centre, unique cycle network, and local neighbourhood centres in residential areas, they were key to the success of establishing the town in the heart of Hertfordshire.

 

In 1962, there was a fear that the government was going to disband the Development Corporation, which led to Vincent and Gorbing establishing their own practice. The firm began to undertake private planning and architectural work throughout the South East while continuing to work as consultants to the Development Corporation until it was wound up in 1980.

 

By the time the recession hit in the early ’80s, Vincent and Gorbing had grown to around 70 employees and had offices in both Stevenage and London. A decision was made to limit the practice to its home in Stevenage. Since then, the firm has continued to expand its work, retaining a core of staff to deliver its diverse architectural and town planning services.

 

Read more about Leonard Vincent and Ray Gorbing in the links provided.

 

Stevenage New Town

The New Towns Act of 1946 was established to deliver a large amount of housing in the UK after the devastating effects of World War II and as a solution to overcrowding in cities. There were 13 planned towns in the first wave of the New Towns Act, and Stevenage was the very first, with each town able to accommodate a population of up to 60,000 inhabitants (around 780,000 homes in the 13 locations). The plan on the right of the screen shows the old town of Stevenage, represented as black dots to the north, with the town centre immediately to the south, which would house an administrative, entertainment, and cultural centre. The red tone expanding outward from the centre was designated as the residential area, accommodating the 60,000 new homes, with local neighbourhood centres and schools interspersed.

 

One of the key ideas behind the Town Centre was to provide a shopping and administrative centre free from cars, and Stevenage is the first New Town to realise this strategy. However, it wasn’t always going to be the case. There was strong opposition to the pedestrianised town within local government, concerned that the scheme might fail. One of the founding members of Vincent + Gorbing, Leonard Vincent (chief architect and planner of the Stevenage Development Corporation), begrudgingly produced alternative plans with a more conventional road through the town centre. There was strong opposition from local residents against the conventional shopping district, which convinced the local government to revert back to the pedestrianised centre.

 

The separation of vehicles from pedestrians is evident throughout the whole of the new town. A town planned for future expansion, dual carriageways are separated from cycle and footpaths, one of the successes of the plan, providing safe ways of moving around Stevenage. The generous cycle paths around the town are mostly lined with mature trees and nature, creating a pleasant and safe route from one destination to another.

 

Another aspect that was unique to the planning of the Town Centre was the proximity and accessibility of industrial areas to the Town Centre. This was important as it created employment opportunities for people moving from cities and fostered a micro-economic environment in which to prosper.

 

Architectural vision

The text below was written retrospectively by Leonard Vincent and published in ‘The Town Planning Review’ in July 1960.

 

The Centre is a complex of buildings forming a coherent architectural conception, but needing to meet the requirements of numerous tenants or building lessees, It has been erected by one contractor at one time to the design of one architect, and is therefore probably unique in this respect.

The buildings and their adjacent spaces, both in height and width, have been carefully related and designed on a 3′-4″ module within a main grid of 2o’-o”. This module was chosen because it allowed flexibility in changing from 3′-4′ to 5′-o” on 1o’ or 20′ spacings, to meet the needs of various lessees.
Around the square and the central pedestrian way the buildings are constructed with a precast reinforced concrete frame and clad in steel, glass, stone, exposed stone aggregate panels, mosaics, tiles, and brick. The structural frame is a dominant feature of the design, but the buildings are deliberately designed to form a backcloth to the three-dimensional, spatial conception of the Centre and the movement of people going about their daily tasks. The buildings in the minor pedestrian ways are in cross-wall construction, with infilling panels of steel, glass, brick and other materials.

Connecting all shops near first-floor level are continuous canopies and cross canopies, finished in timber to contrast with the hard materials of the buildings.

These canopies serve to emphasise and unify the architecture in a dramatic manner, so much so that there was no necessity to control shop fronts. In general, shop fronts have been well designed.

All the street furniture has been specially designed by the architect: lamp standards and fittings, seats, litter bins, cycle bollards, concrete flower and shrub boxes, name-plates, signs, and kiosks. The pavings are in dark grey slabs contrasted with lighter grey and random panels of granite setts around trees and in pedestrian ways, where changes of fall and level takes place. No colour has been introduced into the paving, as the buildings provide all that is necessary. A freestanding piece of sculpture is placed on the platform in a dominating position in the square. The pool is lined with black tiles and mosaics, with Broughton Moor slate coping, and has a simple fountain. The clock tower, which is constructed of pre-stressed, precast concrete, is faced with black polished granite. Several panels of varying materials, such as tiles and stone, have been introduced into the tower, although generally it appears as an open structure. It has been deliberately designed from a looking up’ point of view, therefore, the soffits have been covered with interesting patterns of coloured tiles. The clock is fully chiming and the bells are hung in the top section of the tower. The clock face frame is in bronze and the cat ladder and railings in stainless steel.

An advertisements scheme for the whole Centre was prepared on the basis that it should form part of the architecture, and not dominate it or spoil it. This is probably the first time in which a positive approach has been made to outdoor advertising, making it part of a general scheme of civic design and architecture.

Original plan of Stevenage New Town.
Vincent + Gorbing Stevenage Clock Tower