East Coast College

Great Yarmouth

Town Planning
Education

Client
Kier and Department of Education

Services
Planning

Public Engagement

Status
Full planning permission achieved (currently on site)

V+G were appointed in 2023 to advise the client and manage the preparation and determination of a planning application (including pre-app consultation) for the redevelopment of the main Eastern Campus.

 

The scheme was designed so as to maintain the operation of a number of the existing buildings throughout the construction period. V+G also arranged, managed and reported on the public engagement, and secured temporary enabling works through separate applications. A PPA was negotiated with the LPA to ensure timely determination.

 

Key planning challenges included the fact that the site falls entirely within Flood Zone 3, negotiations with the newly formed Active Travel England, and demonstrating that the scheme, which proposed a new three storey substantial building was appropriate in relation to the surrounding townscape.

 

In addition to the main application, V+G also advised on an secured permission for enabling works via two separate planning permissions, allowing delivery of temporary teaching accommodation during construction, and temporary off site car parking and construction compound. All were secured with minimum pre-commencement conditions to limit delays to the start on site.