Architecture
Office, Masterplan
Client
Hertfordshire Constabulary
Contractor
Willmott Dixon
Value
£59m
Sustainability
BREEAM (tbc), WELL (tbc)
Status
Complete 2026
Photography
Jacob Milligan
Located in Welwyn Garden City, the 9,600 sq m headquarters replaces three buildings dating from the 1960s and 1970s that had reached the end of their operational life. Designed as a long-term asset for the Constabulary, the building responds to evolving patterns of work while creating a connected and adaptable environment capable of serving the organisation for decades to come.
The site’s natural topography played a central role in shaping the architectural response. Falling approximately seven metres from the edge of Welwyn Garden City towards Stanborough Lakes, the landscape informed the arrangement of two office wings, stepping with the terrain and maximising views across the lakes and surrounding Green Belt landscape. One wing rises to five storeys, the other to four, creating a composition rooted in its setting while taking advantage of the site’s distinctive character.
At the heart of the headquarters is a four-storey atrium that acts as the social and organisational centre of the building. Connecting the two office wings, the space provides a shared arrival point for staff and visitors while encouraging interaction between departments that were previously separated across multiple locations. Above, an engineered timber grid roof introduces warmth and natural character, drawing daylight deep into the building and creating an environment that supports wellbeing as much as operational performance.
The atrium accommodates building reception, meeting spaces, agile working areas and a museum celebrating the history of policing within Hertfordshire. This civic heart extends into a double-height restaurant overlooking the surrounding landscape, reinforcing visual and physical connections to nature throughout the building.
The design is guided by principles of openness, connectivity and wellness. Flexible workspaces, collaborative settings and restorative areas are integrated throughout, supporting contemporary patterns of agile working while promoting knowledge sharing and informal interaction.
The aspiration to achieve WELL Platinum certification further reflects the project’s emphasis on occupant wellbeing. High levels of natural daylight, carefully framed views of the surrounding landscape and a calm, considered material palette contribute to a workplace that supports both physical and mental health.
Beyond the building, the landscape strategy extends these principles into the wider site. Restorative outdoor spaces, edible planting and diverse habitats create opportunities for engagement with nature while enhancing biodiversity. Rain gardens, native species planting, bee habitats, log piles and herb gardens contribute to a richer ecological environment and support sustainable water management across the campus.